SgurrEnergy Achieves ISO 17020 Accreditation






    SgurrEnergy Achieves ISO 17020 Accreditation






      Wind and solar energy

      SgurrEnergy Achieves ISO 17020 Accreditation

      As champions of innovation and excellence in the renewable energy sector, SgurrEnergy is thrilled to share our latest milestone: accreditation as an ISO/IEC 17020 Type-C Inspection Body by NABCB. This achievement isn't just a testament to our commitment to excellence and compliance – it's a strategic move that unlocks a myriad of unparalleled benefits for your projects.
      With a proven track record of delivering comprehensive end-to-end solutions for renewable energy projects, SgurrEnergy has established business operations in Saudi Arabia, China, the USA, and Africa. Our future aspirations include regional offices in other geographies.
      Owing to the significant growth of renewables in the global energy landscape, SgurrEnergy has grown its inspection team to cater to the third-party inspection services. This includes conducting Third Party Inspection (TPI) of International and domestic solar PV modules for our clients.
      As an independent consultant for project developers, SgurrEnergy's team of experts conducts TPI of solar PV modules to instill confidence in our clients that the modules manufactured meet their specific requirements and quality criteria at each stage.

      CONSULTANT

      MANUFACTURING SURGE

      GEOPOLITICAL PREFERENCE

      INDEPENDENT TPI

      Our Inspection Services 

      Factory_Pre production Audit

      Factory / Preproduction Audit

      • Equipment condition and calibration
      • Process documentation and control
      • Raw material inspection and testing
      • Safety compliance assessment
      Container Loading Inspection

      Container Loading Inspection

      • Quantity and type verification
      • Packaging integrity inspection
      • Proper placement and securing
      • Container condition assessment
      Final_Pre-Dispatch inspection

      Final / Pre-Dispatch Inspection

      • Sampling based Safety tests
      • Visual inspection for damage and defects
      • EL check for inherent and process defects
      • Flash test for Maximum power determination
      • Documentation review and report preparation
      • Issuance of MDCC
      Warehouse_Incoming Inspection

      Warehouse / Incoming Inspection

      • Check storage conditions
      • Incoming material receiving and identification
      • Visual inspection for physical damage or defects
      • IQC check, specifications and documentation
      In-line_In-process inspection

      In-line / In-process Inspection

      • Continual In-process monitoring and testing as per QAP
      • Compliance with standard operating procedures (SOPs).
      • Non-conformance identification and disposition
      • Preparation of daily reports and raising alarm for deviations
      Lab test witness

      Lab Test Witness

      • Monitoring test execution
      • Documentation and verification of test results
      • Compliance with testing standards and protocols
      • Review of test result accuracy
      • Identification of potential sources of defects
      • Witness reliability tests

      Benefit

      Detailed Engineering for Adani Green Energy, 648MW, India

      SgurrEnergy covering ISO 17020 standard requirements

      • Process Optimization and Control
      • Malpractice control
      • BOM Control
      • Analysis
      • Software
      Acwapower
      Fourthpartnerenergy
      Frontier
      home-client26
      VIRESCENT
      CS_logo 2
      CS_logo 3
      CS_logo 4
      CS_logo 7
      CS_logo 8
      CS_logo 9
      CS_logo 10
      CS_logo 11